Loading...
HomeMy WebLinkAbout0119385-Plumbing (toilet) 0 OSHKOSH ON THE WATER Job Address 1930 SIMPSON ST Contractor J RASMUSSEN PLUMBING INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Valuation Issued By CITY OF OSHKOSH No 119385 PLUMBING PERMIT. APPLICATION AND RECORD Shower Floor Drain 0 Lndry Tray 1 Disposal Dishwasher Owner LUCILLE E MILLER Create Date 05/08/2006 Category 410 - Residential-Interior Plan Water Softner Wait St. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Sump Pump Classrm Sink Breakrm Sink Ejector/Grind r~~'"' ~"'OO~ -"'IT ~ Size 1# Conn. Type Material Type Sanitary Sewer Storm Sewer Water Service Parcelld 1# 1409700000 $150.00 $0.00 $20.00 0 Permit Voided I Plan Approval Permit Fees Date 05/0812006 in the performance of this work. I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which itis not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Address 1914 GREENBRIAR TRL Date AgenUOwner OSHKOSH WI 54904 - 0000 Telephone Number 920-233-6747 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.