Loading...
HomeMy WebLinkAbout0119398-Building (replace membrane) 'Oß OSHKOSH ON THE WATER Job Address 3000 POBEREZNY RD CITY OF OSHKOSH No 119398 BUILDING PERMIT. APPLICATION AND RECORD Owner EAA Create Date 05/08/2006 Designer Contractor M W TIGHE ROOFING INC Category 141,ExteriorRemocieling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq,Ft. Rooms Height Ft, 0 Projection I Finished/Living Bedrooms Stories Canopies Signs Garage ~Sq.Ft. Baths -- Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures 0 Use/Nature Comm/ Remove existing EPDM membrane, and install new EPDM membrane. No structural work. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation ,000.00 Plan Approval $0.00 Permit Fee Paid $274.00 Park Dedication $0.00 Issued By: Date 05/0812006 Final/O.P, 00/00/0000 0 Permit Voided I Parcelld # 1323350000 In the perfonnance of this work I agree to perform all work pursuant to rules governing the described construction, While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the pennit applicant to contact the easement hoider(s) and to secure any necessary apP!J?als be~ starting such activity. --.:::- 0 - CU;; Signature ...::;--~¿ 5d Date" - 0 AgenUOwner Address 163 W MC WILLIAMS ST FOND DU LAC WI 54935 - 0000 Telephone Number 920,923-2603 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.