Loading...
HomeMy WebLinkAbout0119380-Building (exterior) e OSHKOSH ON THE WATER Job Address 689 S OAKWOOD RD CITY OF OSHKOSH No 119380 BUILDING PERMIT - APPLICATION AND RECORD OWner DANIEL L BERGIR A SCHAEFER Create Date 0510812006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size UnfinishedlBasement ~ Sq. Ft. Rooms Height Finished/Living ~ Sq. Ft. Bedrooms Stories Garage ~ Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Park Dedication Flood Plain Height Permit # Dwelling Units ~ # Structures ~ UselNature SFR I REPLACE SOFFIT AND GUTTERS, NO STRUCTURAL CHANGES, CONTRACTOR WILL BE BEST CHOICE SIDING. LLC of Work HVAC Contractor Plumbing Contractor Electric Contractor $1,720.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Fees: Valuation Issued By: /?) <i/J Date 0510812006 FinaIIO.P. 0010010000 0 Permit Voided I Parcelld # 0654310000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu any necessa ap ovals re starting such activity. Date 5~/g /0 6 Signature Address 689 S OAKWOOD RD OSHKOSH WI 54904 - 7941 Telephone Number --;/0 '-63!f/ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.