Loading...
HomeMy WebLinkAbout0119371 E e OSHKOSH ON THE WATER Job Address 1936 E MURDOCK AVE CITY OF OSHKOSH No 119371 ELECTRIC PERMIT - APPLICATION AND RECORD Owner CLAY W/PEGGY A TEFFT Create Date 05/01/2006 Contractor HOMEOWNER Category 612 - Residential-Single Family Addition/R Plan Service 0 Change 0 Temp . N/A Type 0 Overhead 0 Underground Volts Amps 0 New 120/240 Circuits -----------1 Luminaires 30 Switches Receptacles Appliances Use/Nature of rSFRIlnstall new 2.5T Condensing unit - NO EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED Work Fees: Valuation Issued By: .¡IfY $300.00 Plan Approval $0.00 Permit Fee Paid $20.00 Date 5/8/2006 D Permit Voided I Parcelld # 1518670100 The undersigned, in applying for an Electric Penmit to perform electrical work within a single family home, owned and occupied as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this pe~..m' application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see e any necessa ppr als before starting such activity. Signature Date SIt lob Agent/Owner OSHKOSH WI 5490 - 2536 Telephone Number Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified othervvise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.