Loading...
HomeMy WebLinkAbout0119391-Plumbing e OSHKOSH ON THE WATER Job Address 753 N MAIN ST CITY OF OSHKOSH No 119391 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher 5 Sump Pump 5 Classrm Sink Breakrm Sink Ejector/Grind $12,000.00 Contractor KURT ZENTNER & SONS INC Issued By Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well 5 Drink Ftn Plan Approval $0.00 Owner ZION LUTHERAN CHURCH Create Date 05/08/2006 Category 440 - Industrial-Interior Plan Wait.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Piaster Sink Surgeons Sink F Prep Sink Serv Sink Permit Fees Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal Coffee Maker Int Grease Trap Ext Grease Trap - RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Standp Rec Ice Maker Gar Drain Soda Disp INSTALL NEW DROP-IN SINKS WITH INSTANTANEOUS ELETRIC WATER HEATERS NO EIV "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1006540000 $105.00 0 Permit Voided I Date 05/08/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2860 OREGON ST Agent/Owner OSHKOSH WI 54902 - 0000 Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Telephone Number 235-1340 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.