Loading...
HomeMy WebLinkAbout0119386 P e OSHKOSH ON THE WATER Job Address 522 JACKSON ST Contractor J RASMUSSEN PLUMBING INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119386 Owner SETH HENDRICKSON Create Date 05/08/2006 Plan Category 411 - Residential-Water Heaters Shower Floor Drain Lndry Tray Disposal Dishwasher Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater 1 Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water softner Local Waste Clothes Wshr Wait.st. Ice Chest Exam Sink sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink serv Sink Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal standp Rec Ice Maker Gar Drain Coffee Maker Int Grease Trap Ext Grease Trap - RPZ Valve Eye Wash statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn $0.00 Permit Fees Date 05/08/2006 Soda Disp REPLACE GAS WATER HEATER "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0703280000 $20.00 D Permit Voided I $600.00 Plan Approval In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit appiication within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1914 GREENBRIAR TRL Telephone Number 920-233-6747 Agent/Owner OSHKOSH WI 54904 - 0000 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will aSsume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.