Loading...
HomeMy WebLinkAbout0119388 P e OSHKOSH ON THE WATER Job Address 2402 JACKSON ST CITY OF OSHKOSH No 119388 PLUMBING PERMIT -APPLICATION AND RECORD Shower Floor Drain 2 Lndry Tray 3 Disposal Dishwasher Owner MICHAEL D STRYCKER Create Date 05/08/2006 Category 440 - Industrial-Interior Plan Water Softner Wait. St. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZValve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor MERTEN PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Valuation Issued By Sump Pump Classrm Sink Breakrm Sink Ejector/Grind INSTALL NEW PLUMBING FIXTURES "MIKE'S PLACE" "CHECK #9452 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1518240000 $2,000.00 $0.00 $35.00 0 Permit Voided I Plan Approval Permit Fees Date 05/08/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described oonstruction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address Date 1076 COZY LN Agent/Owner OSHKOSH Telephone Number 231-6795 WI 54901 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.