Loading...
HomeMy WebLinkAbout0119393-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 2129HAZELST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119393 Contractor GARTMAN MECHANICAL Category 410 - Residential-Interior Owner SEAN BUTLER/DENiSE ROBSON Create Date 05/0812006 Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower WaterSoftner - Wail.SI. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink 1 Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Coffee Maker Int Grease Trap Ext Grease Trap - RPZValve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Urinal Standp Rec Ice Maker Gar Drain Soda Disp Use/Nature REPLACE GAS WATER HEATER "DEBiT ACCT of Work Valuation Issued By Size Material Type # Conn. Type Parcelld # 1524020000 $600.00 $0.00 Permit Fees $20.00 D Permit Voided I AgenVOwner OSHKOSH WI 54902 - 0000 Sanitary Sewer Storm Sewer Water Service Plan Approval Address 520 W SOUTH PARK AV Date 0510812006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature 920-231-5530 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.