HomeMy WebLinkAbout0119390-Plumbing (basement toilet)
e
OSHKOSH
ON THE WATER
Job Address 823HARMELAVE
CITY OF OSHKOSH
No
119390
PLUMBING PERMIT - APPLICATION AND RECORD
Owner PERRY S/KELLEY HANSEN
Create Date 05/08/2006
Contractor D R GLAZE PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Issued By
Category 410 - Residential-Interior
Plan
Shower Water Softner Wail.SI. Shamp Sink Coffee Maker
-
Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
- -
1 Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink Soda Disp
REPLACE BASEMENT WATER CLOSET "CHECK #3995
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1412140000
$400.00
$0.00
$20.00 D Permit Voided I
Plan Approval
Permit Fees
Date 05/0812006
In the performance of this work. I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address
Date
1865 JAMES RD
Agent/Owner
OSHKOSH
Telephone Number 920-589-4014
WI 54904 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.