HomeMy WebLinkAbout0119401-Plumbing (added fixtures)
e
OSHKOSH
ON THE WATER
Job Address 3160 ELK RIDGE DR
Contractor WATTERS PLUMBING
CITY OF OSHKOSH
No
119401
PLUMBING PERMIT. APPLICATION AND RECORD
Owner MIDWEST GENERAL CONTRACTORS INC
Category 440 - Industrial-Interior
Create Date 05/08/2006
Plan
Bathtub Shower 8 Water Softner Wait. 51. Shamp Sink Coffee Maker
-
Whirlpool Floor Drain Local Waste Ice Chest FlrlWstSink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
-
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature
ofWork
FIXTURES ADDED TO EXISTING PERMIT PER JAMIE FROM WATTERS "DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
$56.00 0 Permit Voided I
Valuation
$21,540.00
Plan Approval
$0.00
Permit Fees
Issued By
Date 05/08/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 118
Agent/Owner
MENASHA
WI 54952 -0118
Telephone Number
920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.