Loading...
HomeMy WebLinkAbout0119401-Plumbing (added fixtures) e OSHKOSH ON THE WATER Job Address 3160 ELK RIDGE DR Contractor WATTERS PLUMBING CITY OF OSHKOSH No 119401 PLUMBING PERMIT. APPLICATION AND RECORD Owner MIDWEST GENERAL CONTRACTORS INC Category 440 - Industrial-Interior Create Date 05/08/2006 Plan Bathtub Shower 8 Water Softner Wait. 51. Shamp Sink Coffee Maker - Whirlpool Floor Drain Local Waste Ice Chest FlrlWstSink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature ofWork FIXTURES ADDED TO EXISTING PERMIT PER JAMIE FROM WATTERS "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # $56.00 0 Permit Voided I Valuation $21,540.00 Plan Approval $0.00 Permit Fees Issued By Date 05/08/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 118 Agent/Owner MENASHA WI 54952 -0118 Telephone Number 920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.