Loading...
HomeMy WebLinkAbout0119389-Plumbing (toilet) ~ OSHKOSH ON THE WATER Job Address 2445 BLAKE CT CITY OF OSHKOSH No 119389 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray 1 Disposal Dishwasher OWner JACK AIMARY K FULLER Create Date 05/08/2006 Category 410 - Residential-Interior Plan WaterSoftner Wall.SI. Shamp Sink Coffee Maker ~ Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin ~ Ex! Grease Trap ~ Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor D R GLAZE PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Sump Pump Classrm Sink Breakrm Sink Ejector/Grind I'~ "m, =~ ~~ ,~ Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0622050000 $435.00 $0.00 $20.00 D Permit Voided I Plan Approval Permit Fees Date 05/08/2006 In the performance of this work, I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described In this penmlt application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 1865 JAMES RD Date Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 920-589-4014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspec1ion is not performed within two business days from the time the project is ready.