HomeMy WebLinkAbout0119356-Plumbing (basement under house)
e
OSHKOSH
ON THE WATER
Job Address 114 E MELVIN AVE
Contractor BAUMGART PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
119356
Owner LEE M SCHIMKE
Create Date 05/05/2006
Category 410 - Residential-Interior
Bathtub Shower ~
Whirlpool Floor Drain 1
Lavatory ~ Lndry Tray
Toilet 1 Disposal
Res. Sink Dishwasher
Bar Sink Sump Pump
Water Heater - Classrm Sink
Site Drain Breakrm Sink
Roof Drain Ejector/Grind 1
Misc.
Fixtures
Water Softner Wail. 51.
Local Waste Ice Chest
Clothes Wshr ~ Exam Sink
Bidet Sculry Sink
Beer Tap Hand Sink
Lab Sink Plaster Sink
Sterilizer Surgeons Sink
Dip Well F Prep Sink
Drink Ftn Serv Sink
Plan
Shamp Sink - Coffee Maker
FlrlWst Sink Int Grease Trap
Catch Basin - Ext Grease Trap -
Wash Ftn RPZ Valve
Urinal Eye Wash Statn
Standp Rec ~ WtrSewerMtrs
Ice Maker Deduct Meters
Gar Drain Wtr Usage Mtrs
Soda Disp
Use/Nature Install basement under existing single family home.
ofWork
Size
Material
#
Sanitary Sewer
Storm Sewer
Water Service
Type
Conn. Type
Parcelld #
1001720000
Valuation
$3,000.00
$0.00
Permit Fees
$49.00 0 Permit Voided I
Plan Approval
Issued By
Date 05/05/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perfonm the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the
easement holder and to secure a ecessary appr als before starting such activity.
5:'-
Signature
Address N5209 HWY 55
SEYMOUR
WI 54165 -8115
Date 6" -5' -Db
Telephone Number 920-788-9983
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.