Loading...
HomeMy WebLinkAbout0119356-Plumbing (basement under house) e OSHKOSH ON THE WATER Job Address 114 E MELVIN AVE Contractor BAUMGART PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119356 Owner LEE M SCHIMKE Create Date 05/05/2006 Category 410 - Residential-Interior Bathtub Shower ~ Whirlpool Floor Drain 1 Lavatory ~ Lndry Tray Toilet 1 Disposal Res. Sink Dishwasher Bar Sink Sump Pump Water Heater - Classrm Sink Site Drain Breakrm Sink Roof Drain Ejector/Grind 1 Misc. Fixtures Water Softner Wail. 51. Local Waste Ice Chest Clothes Wshr ~ Exam Sink Bidet Sculry Sink Beer Tap Hand Sink Lab Sink Plaster Sink Sterilizer Surgeons Sink Dip Well F Prep Sink Drink Ftn Serv Sink Plan Shamp Sink - Coffee Maker FlrlWst Sink Int Grease Trap Catch Basin - Ext Grease Trap - Wash Ftn RPZ Valve Urinal Eye Wash Statn Standp Rec ~ WtrSewerMtrs Ice Maker Deduct Meters Gar Drain Wtr Usage Mtrs Soda Disp Use/Nature Install basement under existing single family home. ofWork Size Material # Sanitary Sewer Storm Sewer Water Service Type Conn. Type Parcelld # 1001720000 Valuation $3,000.00 $0.00 Permit Fees $49.00 0 Permit Voided I Plan Approval Issued By Date 05/05/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perfonm the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder and to secure a ecessary appr als before starting such activity. 5:'- Signature Address N5209 HWY 55 SEYMOUR WI 54165 -8115 Date 6" -5' -Db Telephone Number 920-788-9983 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.