HomeMy WebLinkAbout0119361-Building (finish garage)
0
OSHKOSH
ON THE WATER
Job Address 1940 GEORGIA ST
CITY OF OSHKOSH
No
119361
BUILDING PERMIT - APPLICATION AND RECORD
OWner JAMES C HIBBERT
Create Date
05/03/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Q Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement - Sq. Ft. Rooms Height
Finished/Living - Sq. Ft. Bedrooms Stories
Garage - Sq. Ft. Baths
Ft.
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
~:~~~~ure \s~~b~~~~i~nnge~/~; g:~:~h~:~~s :n';11c;.:I:~~h~ ~~~~~~¡~he: ;h":=~~n~nd Installing insulation. Per the UDC Nailing Schedule the osb
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1.500.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
/}? 0.0
Date 05/05/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1408601000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to s cure any necessary approvals before starting such activity.
Signature
Agent/Owner
Oshkosh
WI 54901 - 0000
Date 5< 5'~ao
Telephone Number ~dO- ð \<1.C, S~7
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.