HomeMy WebLinkAbout0119347-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 335 FOSTER ST
CITY OF OSHKOSH
No
119347
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor COATS, KEITH
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Sanitary Sewer
Storm Sewer
Water Service
Owner DEL TRITT CONSTRUCTION LLC
Create Date 05/05/2006
Plan
Category 401 - Residential-Exterior (laterals)
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink -
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ex! Grease Trap -
RPZValve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Material
Plastic
Plastic
Copper
Valuation
Use/Nature New SFR sewer and water laterals. (ck# 6649)
of Work
Size
4"
4"
1"
Type
Lateral
#
Conn. Type
New
Lateral
New
Lateral
New
Parcelld #
0608700100
$2,500.00
Plan Approval
$150.00 0 Permit Voided I
Issued By
$0.00
Permit Fees
Date 05/05/2006
In the performance of this work, I a9ree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this permit appiication within an easement, the City strongiy urges the permit applicant to contact the
easement holder(s nd to secure any n~ary approvals before starting such activity.
Signature --- l þ~
Agent/Owner
Address 8424 SHIRLEY CT
WINNECONNE
WI 54986 - 9533
Date V f:7ðG
Telephone Number
920-582-3975
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not perfonmed within two business days from the time the project is ready.