Loading...
HomeMy WebLinkAbout0119352-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 3110BAILEYCT CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No Owner RUSCH HOMES LLC Create Date Contractor J & P EXCAVATING Category 401 - Residential-Exterior (laterals) Plan Bathtub Shower Whirlpool Floor Drain Lavatory Lndry Tray Toilet Disposal Res. Sink Dishwasher Bar Sink Sump Pump Water Heater - Classrm Sink Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Breakrm Sink Ejector/Grind WaterSoftner Wait St. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Install sewer and water laterals for new SFR (Debit Account) Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer 4" Plastic Lateral 1 New Water Service 1-1/4" Plastic Lateral 1 New Parcelld # 1342951000 $1,200.00 Plan Approval $0.00 $150.00 0 Permit Voided I Permit Fees Date 05/05/2006 In the performance of this work, i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3162 SCENiC DR OSHKOSH WI 54904 - 0000 Telephone Number 379-0309 (C) To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.