Loading...
HomeMy WebLinkAbout0119338-Building (siding) ~ OSHKOSH ON THE WATER Job Address 1764 SOUTHLAND AVE CITY OF OSHKOSH No 119338 BUILDING PERMIT -APPLICATION AND RECORD Owner CHRISTOPHER J STEPHENSON Create Date 05/04/2006 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height Ft. 0 Projection I Canopies Finished/Living Bedrooms Stories Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Owelling Units 0 # Structures ---.!1 Use/Nature of Work FRilnstall vinyl siding on house and garage - No EIV provided. any electrical work requires an additional electrical permit. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5.000.00 Plan Approval $0.00 Permit Fee Paid - $44.00 Park Dedication $0.00 Issued By: Date 05/04/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1611070000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 825 AgenUOwner OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.