HomeMy WebLinkAbout0119338-Building (siding)
~
OSHKOSH
ON THE WATER
Job Address 1764 SOUTHLAND AVE
CITY OF OSHKOSH
No
119338
BUILDING PERMIT -APPLICATION AND RECORD
Owner CHRISTOPHER J STEPHENSON
Create Date
05/04/2006
Designer
Contractor
SALZER SIDING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
Ft.
0 Projection I
Canopies
Finished/Living
Bedrooms
Stories
Garage
~Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Owelling Units 0
# Structures
---.!1
Use/Nature
of Work
FRilnstall vinyl siding on house and garage - No EIV provided. any electrical work requires an additional electrical permit.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$5.000.00 Plan Approval
$0.00 Permit Fee Paid - $44.00 Park Dedication
$0.00
Issued By:
Date 05/04/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1611070000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
AgenUOwner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.