Loading...
HomeMy WebLinkAbout0119344-Plumbing e OSHKOSH ON THE WATER Job Address 1575 W SOUTH PARK AVE CITY OF OSHKOSH No 119344 PLUMBING PERMIT - APPLICATION AND RECORD Contractor O'NEILL ENTERPRISE INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Valuation Issued By Shower Floor Drain Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer OWner NINAS INVESTMENTS" LLC Create Date 05/04/2006 Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Dip Well Drink Ftn Category 430 -Industrial-Exterior (Iaterais) Plan Fil179-0306-P Wail.SI. Shamp Sink - Coffee Maker Ice Chest FlrlWst Sink Int Grease Trap Exam Sink Catch Basin - Ex! Grease Trap - Sculry Sink Wash Ftn RPZ Valve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp Coffee Kiosk sewer and water services (Debit Account) Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer Water Service 1" Plastic Lateral 1 New Parcelld # 1323070000 $5,000.00 $0.00 Permit Fees $100.00 0 Permit Voided I Plan Approval Date 05/04/2006 in the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W 6TH AVE AgenUOwner OSHKOSH Telephone Number 920-230-2007 WI 54902 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.