Loading...
HomeMy WebLinkAbout0119336-Building (siding) e OSHKOSH ON THE WATER Job Address 1408 E NEVADA AVE CITY OF OSHKOSH No 119336 BUILDING PERMIT. APPLICATION AND RECORD Owner JON J/LiSA HIBBARD Create Date 05/04/2006 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence Q Raze Zoning Class of Const: Size Finished/Living - Sq. Ft. - Sq. Ft. Rooms Height Ft. D Project~~ Unfinished/Basement Bedrooms Stories Canopies Garage _Sq.Ft. Baths Signs Foundation . Poured Cencrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures 0 Use/Nature ofWork SFRIlnstaii vinyi siding on house - No EIV provided. any electrical work requires an additional electrical permit. - Also installing 14 I'~M"_- ~_.- HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $9.500.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: Date 05/04/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1514440000 in the performance of this work I agree to perform aii work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, If you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 825 AgenUOwner OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i,e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.