Loading...
HomeMy WebLinkAbout0119324-Building (roof) ~ OSHKOSH ON THE WATER Job Address 1130 LAAGER LN CITY OF OSHKOSH No 119324 BUILDING PERMIT - APPLICATION AND RECORD OWner PETER T/KAREN HIELSBERG Create Date 05/04/2006 Designer Contractor ARMR INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement _Sq.Ft. _Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Signs Garage _Sq.Ft. Baths Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units -------.<1 # Structures 0 Use/Nature SFRI Tear-off roofing. install new roofing and leaf releif system on existing gutters - No Structural work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,100.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Issued By: Date 05/04/2006 Final/O.P. 00/00/0000 D PenmltVoided I Parcelld # 1310620000 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 318 PROSPECT AVE AgenUOwner N FOND DU LAC WI 54937 - 0000 Telephone Number 920-923-2459 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.