HomeMy WebLinkAbout0119341-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 1220 GREENFIELD TRL
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
119341
Owner DENNIS E MCHUGH
Create Date
05/04/2006
Contractor
SALZER SIDING
Designer
Category
141 - Exterior Remodeling
Plan
Type
. Buliding
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement - Sq. Ft. Rooms Height
Finished/Livin9 - Sq. Ft. Bedrooms Stories
Garage - Sq. Ft. Baths
Ft.
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
~
Use/Nature SFRIlnstaii vinyl siding on house, wrapping window openings, and installinf 14 replacement windows, same size and location. - No EIV
of Work provided, any electrical work requires an additional electrical permit
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$8,900.00 Plan Approval
$0.00 Permit Fee Paid
$68.00 Park Dedication
$0.00
Issued By:
Date 05/04/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1314830000
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
Agent/Owner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.