Loading...
HomeMy WebLinkAbout0119332-Plumbing (laterals) ~ OSHKOSH ON THE WATER Job Address 75 95 DAWES ST CITY OF OSHKOSH No 119332 PLUMBING PERMIT - APPLICATION AND RECORD Owner TRI STAR LIVING Create Date 05/04/2006 Plan G2-185-0506-P Contractor MARSHALL PLUMBING Category 430 - Industrial-Exterior (laterals) Bathtub Shower Water Softner Wait.S!. Shamp Sink Coffee Maker ~ Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap ~ Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature of Work 12" STORM LATERAL FOR NEW MULTI FAMILY TOWNHOUSES. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 12" Plastic Lateral 1 New Water Service Parcel Id # 0102430000 Valuation $5,000.00 Plan Approval $0.00 Permit Fees $50.00 0 Penmit Voided I Issued By Date 05/04/2006 In the pèrfonmance of this work, I agree to perform all work pursuant to rules goveming the described construction. While tihe City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature Date Address N2026 29TH LN Agent/Owner REDGRANITE WI 54970 - 0000 Telephone Number 361-4846 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.