HomeMy WebLinkAbout0119332-Plumbing (laterals)
~
OSHKOSH
ON THE WATER
Job Address 75 95 DAWES ST
CITY OF OSHKOSH
No
119332
PLUMBING PERMIT - APPLICATION AND RECORD
Owner TRI STAR LIVING
Create Date 05/04/2006
Plan G2-185-0506-P
Contractor MARSHALL PLUMBING
Category 430 - Industrial-Exterior (laterals)
Bathtub Shower Water Softner Wait.S!. Shamp Sink Coffee Maker
~
Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
~
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature
of Work
12" STORM LATERAL FOR NEW MULTI FAMILY TOWNHOUSES.
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer 12" Plastic Lateral 1 New
Water Service
Parcel Id #
0102430000
Valuation
$5,000.00
Plan Approval
$0.00
Permit Fees
$50.00 0 Penmit Voided I
Issued By
Date 05/04/2006
In the pèrfonmance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While tihe City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvais before starting such activity.
Signature
Date
Address N2026 29TH LN
Agent/Owner
REDGRANITE
WI 54970 - 0000
Telephone Number 361-4846
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.