Loading...
HomeMy WebLinkAbout0119339-Building (siding) e OSHKOSH ON THE WATER Job Address 1646COVINGTONDR CITY OF OSHKOSH No 119339 BUILDING PERMIT. APPLICATION AND RECORD Owner SUSAN M KENNAUGH Create Date 05/04/2006 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures --------" Use/Nature SFRilnstall vinyl siding on house and garage - No EIV provided. any electrical work requires an additional electrical permit. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3.100.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 05/04/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcel Id # 1317090000 In the perfonnance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described. in this pennit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 825 Agent/Owner OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.