HomeMy WebLinkAbout0119330-Building (garage)
e CITY OF OSHKOSH No 119330
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1537 BISMARCK AVE Owner ORSON S WilLARD Create Date 0411212006
Designer
Contractor
PACKER VALLEY BUilDERS, INC
Category
149 - Raze detached garage, construct detached garage
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size 22 X 24
UnfinishedlBasement ---...c> Sq. Ft. Rooms 0 Height 0 Ft.
FinishedlLiving ---...c> Sq. Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit Not Requir~
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
0
UselNature
of Work
FRI Fire damage to garage. Raze existing garage and replace with 22 X 24 according to site plan. Will be built according to UDC, details
ttached to permit in address file.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$18,000.00 Plan Approval
$0.00 Penmit Fee Paid
$114.00 Park Dedication
$0.00
Issued By:
¡Ç7I /'
Date 0510412006
FinaIIO.P. 0010010000
D PermitVoidedJ
Parcelld # 0611120000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) a ry approva s e starting such activity.
Date ..ลก--- 7" -cJ1,s
Signatu
Address
OSHKOSH
WI 54904 - 0000
Telephone Number
920-232-7620
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.