HomeMy WebLinkAbout0119322-Building (garage)
de'
OSHKOSH
ONTHEWATER
Job Address 903 ARMORY PL
CITY OF OSHKOSH
No
119322
BUILDING PERMIT - APPLICATION AND RECORD
Owner JOHN R/JANET M ROSS
Create Date
05/04/2006
Designer
Contractor
OWNER
Category
149 - Raze detached garage, construct detached garage
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size 26' x 28'
Unfinished/Basement
- Sq. Ft.
_Sq.Ft.
Rooms
Height
Ft.
0 Projection I
Finished/Living
Bedrooms
Stories 1
Canopies
Garage
_Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ----------'>
# Structures
----------'>
Use/Nature r"FR/ Raze eixsting detached garage, construct new detached garage and drive as per plans. Owner gave permision via phone call to
of Work ssue permit to his agent, as he is out of town.
HVAC Contractor
Plumbing Contractor
Electric Contractor
,000.00 Plan Approval
$0.00 Permit Fee Paid
$99.00 Park Dedication
$0.00
Issued By'
Date 05/04/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 1308800000
in the performance of this work i agree to perform ail work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature ~ ~
AgenUOWner
Date ..$'"-I./-O{,
Address 903 ARMORY PL
OSHKOSH
WI 54902 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.