Loading...
HomeMy WebLinkAbout0119322-Building (garage) de' OSHKOSH ONTHEWATER Job Address 903 ARMORY PL CITY OF OSHKOSH No 119322 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN R/JANET M ROSS Create Date 05/04/2006 Designer Contractor OWNER Category 149 - Raze detached garage, construct detached garage Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size 26' x 28' Unfinished/Basement - Sq. Ft. _Sq.Ft. Rooms Height Ft. 0 Projection I Finished/Living Bedrooms Stories 1 Canopies Garage _Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ----------'> # Structures ----------'> Use/Nature r"FR/ Raze eixsting detached garage, construct new detached garage and drive as per plans. Owner gave permision via phone call to of Work ssue permit to his agent, as he is out of town. HVAC Contractor Plumbing Contractor Electric Contractor ,000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Issued By' Date 05/04/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1308800000 in the performance of this work i agree to perform ail work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~ ~ AgenUOWner Date ..$'"-I./-O{, Address 903 ARMORY PL OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.