HomeMy WebLinkAbout0119340-Building (siding; windows)
e
OSHKOSH
ON THE WATER
Job Address 1228 W 12TH AVE
CITY OF OSHKOSH
No
119340
BUILDING PERMIT -APPLICATION AND RECORD
Owner DEE D/NICKIE S DURANT
Create Date
05/04/2006
Designer
Contractor
SALZER SIDING
Category
141 - Exterior Remodelln9
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft. Rooms
-
Finished/Living - Sq. Ft. Bedrooms
Garage - Sq. Ft. Baths
H~ight
Ft.
D Projection I
Stories
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
0
Use/Nature SFRIlnstall vinyl siding on house and garage. wrapping window openings and installing 14 replacement windows same size and location
of Work No EIV provided. any electricai work requires an additional electrical permit.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$9.800.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Issued By:
Date 05/04/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1308300000
In the performance of this work I agree to perform all work pursuant to rules governing tI1e described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
Agent/Owner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.