Loading...
HomeMy WebLinkAbout0119326-Building (Dining Room) ~ OSHKOSH ON THE WATER Job Address 940 W 6TH AVE CITY OF OSHKOSH No 119326 BUILDING PERMIT - APPLICATION AND RECORD Owner WilLIAM l RUPNICK Create Date 0510412006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size UnfinishedlBasement - Sq. Ft. Rooms Height FinishedlLiving - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units -------.JJ # Structures 0 UselNature RESI Gut Dining Room. Install insulation. drywall, trim. Replace rear window with 48"Tx62"W Bow Window, abandon hallway window. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuati $2.600.00 Plan Approval $0.00 Permit Fee Paid $32.00 Pank Dedication $0.00 Issued By: Date 0510412006 Final/O.P. 0010010000 0 Permit Voided I Parcelld # 0604340000 In the perfonmance of this work I agree to perfonm all work pursuant to nules govemlng the described construction. While the City of Oshkosh has no authority to enfor sement restrictions of which it is not a party, if you perform the work described in this permit application within an ease ent, the ity strongly urges the permit applicant to contact the easement holder(s) and tp se ure any necessary rovals be sing such activity. . I J -() / Signature Date 5'- 7' P AgenUOwner Address 940 W 6TH AVE OSHKOSH ~ 54902 - 5851 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.