Loading...
HomeMy WebLinkAbout0119284-Plumbing (sump pump) ~ OSHKOSH ON THE WATER Job Address 1613WESTERNST Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork CITY OF OSHKOSH No 119284 OWner DARWIN F MCNINCH PLUMBING PERMIT - APPLICATION AND RECORD Shower WaterSoftner Floor Drain Local Waste Lndry Tray Clothes Wshr Disposal Bidet Dishwasher Beer Tap Sump Pump 1 Lab Sink Classrm Sink Sterilizer Breakrm Sink Dip Well Ejector/Grind Drink Ftn Create Date 05/03/2006 Plan Material Permit Fees Category 410- Residential-Interior WI 54901 - 2298 Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal Coffee Maker Int Grease Trap Ext Grease Trap - RPZValve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Wait.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Standp Rec Ice Maker Gar Drain Soda Disp Valuation Issued By r"~" '"" "" ~"" ~~ Size Sanitary Sewer Storm Sewer Water Service Type # Conn. Type Parcelld # 1211280000 $200.00 $0.00 $20.00 0 Permit Voided I Date 05/03/2006 Plan Approval In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522W.MURDOCKAVE Agent/Owner OSHKOSH Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.