HomeMy WebLinkAbout2006-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1245 WALNUT ST
CITY OF OSHKOSH
No
119296
PLUMBING PERMIT. APPLICATION AND RECORD
Owner CHARLES E HANSON
Create Date 05/03/2006
Plan
Contractor SAMMONS PLUMBING
Bathtub Shower
Whirlpool Floor Drain
Lavatory Lndry Tray
Toilet Disposal
Res. Sink Dishwasher
Bar Sink Sump Pump
Water Heater 1 Classrm Sink
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
ofWork
Breakrm Sink
Ejector/Grind
Category 411-Residential-WaterHeaters
Water Softner Wait. 51. Shamp Sink Coffee Maker
-
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap -
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
REPLACE GAS WATER HEATER "DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1206070000
Valuation
Issued By
$600.00
Plan Approval
$0.00
$20.00 0 Permit Voided I
Permit Fees
Date 05/03/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit applicaüon within an easement, the City strongiy urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W.MURDOCKAVE
WI 54901 - 2298
Agent/Owner
OSHKOSH
Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready-