HomeMy WebLinkAbout0119300 P
e
OSHKOSH
ON THE WATER
Job Address 1575 VILLA PARK DR
CITY OF OSHKOSH
No
119300
PLUMBING PERMIT - APPLICATION AND RECORD
Owner KENNETH/HELEN GRABNER LIFE ESTATE
Create Date 05/03/2006
Plan
Contractor SAMMONS PLUMBING
Bathtub Shower
Whirlpool Floor Drain
Lavatory Lndry Tray
Toilet 1 Disposal
Res. Sink Dishwasher
Bar Sink Sump Pump
Water Heater Classrm Sink
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Breakrm Sink
Ejector/Grind
Category 410 - Residential-Interior
Water Softner WaitSt Shamp Sink - Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap
-
Bidet Sculry Sink Wash Ftn RPZValve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
r~' wm,~o"'-œ'" =
Size
Sanitary Sewer
Storm Sewer
Water Service
Material
#
Conn. Type
Type
Parcelld #
1320470000
Valuation
$400.00
Plan Approval
Issued By
$0.00
$20.00 D Permit Voided I
Permit Fees
Date 05/03/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this pennit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
WI 54901 - 2298
Address 522W.MURDOCKAVE
AgenUOWner
OSHKOSH
Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.