Loading...
HomeMy WebLinkAbout2006-Plumbing (toilet/sump pump) e OSHKOSH ON THE WATER Job Address 408 REICHOW ST Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD No Create Date Category 410 - Residential-Interior OWner EVERETT USANTH GOODWIN Plan Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump 1 Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink FIn Serv Sink Shamp Sink - FlrlWst Sink Catch Basin - Wash Ftn Urinal Coffee Maker Int Grease Trap Ext Grease Trap - RPZValve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Standp Rec Ice Maker Gar Drain Soda Disp REPLACE WATER CLOSET AND SUMP PUMP "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0611140000 Use/Nature of Work Valuation Issued By $700.00 $0.00 Permit Fees Date 05/03/2006 Plan Approval $20.00 0 Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penn It application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH WI 54901 - 2298 Address 522W.MURDOCKAVE Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.