HomeMy WebLinkAbout2006-Plumbing (laterals, basins)
e
OSHKOSH
ON THE WATER
Job Address 606 E MURDOCK AVE
CITY OF OSHKOSH
No
119270
PLUMBING PERMIT. APPLICATION AND RECORD
OWner MUZA METAL PRODUCTS CORP
Create Date 05/03/2006
Plan
Contractor FREDERICKSON, GENE TRUCKING & EXCAVATI Category 430 -Industrial-Exterior (laterals)
Bathtub Shower WaterSoftner Wai!'S!' Shamp Sink Coffee Maker
-
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin 8 Ext Grease Trap
-
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Res, Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Bar Sink Sump Pump Lab Sink Piaster Sink Standp Rec Wtr Sewer Mtrs
Water Heater - Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature INSTALLING NEW STORM LATERALS AND CATCH BASINS FOR BUILDING ADDITION.
of Work
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
15"
18"
24"
Concrete
Plastic
Concrete
Lateral
Lateral
Lateral
New
New
New
Water Service
Parcelld #
1519310000
Valuation
$56,000.00
Plan Approval
$0.00
Permit Fees
$206,00 0 Permit Voided I
Issued By
Date 05/03/2006
In tI1e performance of tI1is work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform tI1e work
described in this permit application witl1in an easement, tI1e City stron91y urges the penmit applicant to contact the
easement holder s nd to secure any necessary approvals before starting such activity.
Signature
Date <~=J-cJb
Address W1732 CTY RD KK
AgenVOwner
KAUKAUNA
WI 54130 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.