Loading...
HomeMy WebLinkAbout0119178 VOID e OSHKOSH ON THE WATER Job Address 1618 MENOMINEE DR CITY OF OSHKOSH No 119178 BUILDING PERMIT - APPLICATION AND RECORD VOID Owner RAYMOND/PAMELA KLASKE II Create Date 04/24/2006 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type . Building a Sign 0 Canopy a Fence a Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms Finished/Living ~Sq.Ft. Bedrooms Garage ~Sq.Ft. Baths 0 Projection I Canopies Height 0 Ft. Stories Signs 0 Foundation . Poured Concrete a Fioating Slab a Concrete Block a Post a Pier a Treated Wood a Olher Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ------.2 # Structures 0 Use/Nature SFR/ Constructing a 10' x 10' deck next to the above ground pool. VOIDED ON 5I3/06TO CLOSE OUT THE MONTH OF APRIL- of Work PERMIT WAS ISSUED AND PERMIT WAS NOT PICKED UP HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $500.00 Plan Approval $0.00 Penmit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 04/27/2006 Final/O.P. 00/00/0000 ~ PenmitVoided I Parcelld # 1512700000 In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1618 MENOMINEE DR Agent/Owner OSHKOSH WI 54901 - 2523 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.