Loading...
HomeMy WebLinkAbout0119289-Plumbing (sump pump) G OSHKOSH ON THE WATER Job Address 2655 N MAIN ST CITY OF OSHKOSH No 119289 PLUMBING PERMIT - APPLICATION AND RECORD Owner CITIZENS FIRST CREDIT UNION Create Date 05/03/2006 Plan Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Cate90ry 440 - Industrial-Interior Watersoftner Wai!.s!. Shamp Sink ~ Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap ~ Bidet sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash statn 1 Lab Sink Plaster Sink standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn serv Sink Soda Disp Use/Nature ofWork I~ ,"Me ,"Me .mIT =, Size Valuation Sanitary Sewer Storm Sewer Water Service Material Type # Conn. Type Parcelld # 1519591000 $250.00 Plan Approval Issued By $0.00 Permit Fees $20.00 0 Permit Voided I Date 05/03/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522W.MURDOCKAVE Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.