Loading...
HomeMy WebLinkAbout0119283 P e OSHKOSH ON THE WATER Job Address 242 W LINCOLN AVE CITY OF OSHKOSH No 119283 PLUMBING PERMIT - APPLICATION AND RECORD Owner SPARR INVESTMENTS LLC Create Date 05/03/2006 Plan Contractor D.R. HANSEN PLBG. Category 401 - Residential-Exterior (laterals) Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind WaterSoftner Wail.SI. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Relay sanitary sewer lateral (Debit Account) Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 Relay Storm Sewer Water Service Parcelld # 1006070000 Use/Nature of Work Valuation Issued By $1,500.00 Plan Approval $0.00 $50.00 0 Permit Voided I Permit Fees Date 05/03/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 55 KNAPP ST Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.