Loading...
HomeMy WebLinkAbout0119276-Plumbing (softner & ro unit) e OSHKOSH ON THE WATER Job Address 1255 HURON CT CITY OF OSHKOSH No 119276 PLUMBING PERMIT - APPLICATION AND RECORD Contractor CULLIGAN WATER CONDITIONING Bathtub Whirlpool lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower WaterSoftner Floor Drain local Waste lndryTray Clothes Wshr Disposal Bidet Dishwasher Beer Tap Sump Pump lab Sink Classrm Sink Sterilizer Breakrm Sink Dip Well Ejector/Grind Drink Ftn 1 UNDER KIT SINK RO SYSTEM Owner ROBERT DITHERES RILEY Create Date 05/03/2006 Plan Category 410 - Residential-Interior 1 Wail.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal Coffee Maker Int Grease Trap Ext Grease Trap - RPZValve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Standp Rec Ice Maker Gar Drain Soda Disp INSTALL SOFTENER AND RO UNIT "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1525750000 Use/Nature of Work Valuation Issued By $1.970.90 Plan Approval $0.00 Permit Fees $20.00 0 Permit Voided I Date 05/03/2006 In the performance of this work. I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 405 PROSPECT AVE AgenUOwner N FOND DU LAC WI 54937 - 1498 Telephone Number 235-1490 OR 233-05 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.