HomeMy WebLinkAbout0119288-Plumbing (sump pump)
e
OSHKOSH
ON THE WATER
Job Address 2414HICKORYLN
CITY OF OSHKOSH
No
119288
Contractor SAMMONS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
PLUMBING PERMIT. APPLICATION AND RECORD
Owner CHARLES KNAGGS
Create Date 05/03/2006
Plan
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Category 410 - Residential-Interior
Water Softner
Local Waste
Clothes Wshr
Shamp Sink -
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Coffee Maker
Int Grease Trap
Ext Grease Trap -
RPZValve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
WaitSt
Ice Chest
Exam Sink
Bidet
Beer Tap
1 Lab Sink
Sterilizer
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Soda Disp
Dip Well
Drink Ftn
Use/Nature
ofWork
I~~' WMe eoMe omIT =
Size
Valuation
Issued By
Material
#
Conn. Type
Sanitary Sewer
Type
Storm Sewer
Water Service
Parcelld #
1518675600
$200.00
$0.00
$20.00 D Permit Voided I
Permit Fees
Plan Approval
Date 05/03/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While ttle City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application wittlin an easement. the City strongly urges the permit applicant to contact ttle
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W. MURDOCK AVE
AgenUOwner
OSHKOSH
WI 54901 - 2298
Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.