Loading...
HomeMy WebLinkAbout0119285-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 625 GROVE ST CITY OF OSHKOSH No 119285 PLUMBING PERMIT - APPLICATION AND RECORD Owner TRENT W/MIRIAM SCOTT Create Date 05/03/2006 Contractor SAMMONS PLUMBING Category 411 - Residential-Water Heaters Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Shower Floor Drain Water Sollner Local Waste Clothes Wshr Shamp Sink ~ FlrlWstSink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Coffee Maker Int Grease Trap Ext Grease Trap ~ RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs WaitSt Ice Chest Exam Sink Lndry Tray Disposal Dishwasher Sump Pump 1 Classrm Sink Bidet Beer Tap Lab Sink Sterilizer Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Gar Drain Soda Disp Breakrm Sink Ejector/Grind Dip Well Drink Ftn REPLACE GAS WATER HEATER "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1103880000 $600.00 Plan Approval $0.00 $20.00 D Permit Voided I Permit Fees Date 05/03/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522W.MURDOCKAVE Date Agent/OWner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.