HomeMy WebLinkAbout0119272-Building
~
OSHKOSH
ON THE WATER
Job Address 75 DAWES ST
CITY OF OSHKOSH
No
BUILDING PERMIT. APPLICATION AND RECORD
Owner TRI STAR LIVING
Create Date
Designer
Contractor
TRI STAR LIVING
Category
130 - New Multi-Family
Plan S7-37-0406
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const: liB
Size Irrg
Unfinished/Basement
_Sq.Ft.
_Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories 2
Canopies
Garage
_Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Re~
# Dwelling Units 6
# Structures
----.!
Use/Nature NEW 6 UNIT TOWNHOUSE/ All 3 bedroom units each with 2 car attached garages. Note Occupancy permits will not be issued until all
of Work pf the improvements have been installed and approved Including storm water drainage and grading.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$425.000.00 Plan Approval
~
$0.00 Permit Fee Paid
$1.339.00 Park Dedication
$990.00
Issued By:
Date 05/03/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0102430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
:~~~;:~r:nd tp s cu;e any :}1ary approvals before starting such activity. Date ",5(7/0&
Agent/Owner
Oshkosh
""'l 54901 - 0000 Telephone Number
237-1083
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.