Loading...
HomeMy WebLinkAbout0119272-Building ~ OSHKOSH ON THE WATER Job Address 75 DAWES ST CITY OF OSHKOSH No BUILDING PERMIT. APPLICATION AND RECORD Owner TRI STAR LIVING Create Date Designer Contractor TRI STAR LIVING Category 130 - New Multi-Family Plan S7-37-0406 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: liB Size Irrg Unfinished/Basement _Sq.Ft. _Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories 2 Canopies Garage _Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Re~ # Dwelling Units 6 # Structures ----.! Use/Nature NEW 6 UNIT TOWNHOUSE/ All 3 bedroom units each with 2 car attached garages. Note Occupancy permits will not be issued until all of Work pf the improvements have been installed and approved Including storm water drainage and grading. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $425.000.00 Plan Approval ~ $0.00 Permit Fee Paid $1.339.00 Park Dedication $990.00 Issued By: Date 05/03/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0102430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement :~~~;:~r:nd tp s cu;e any :}1ary approvals before starting such activity. Date ",5(7/0& Agent/Owner Oshkosh ""'l 54901 - 0000 Telephone Number 237-1083 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.