Loading...
HomeMy WebLinkAbout0119307-Plumbing (laundry sink) e OSHKOSH ON THE WATER Job Address 1517 BURDICK ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No Owner RICHARD/SANDRA HACKBARTH REV TRUST Create Date Contractor SAMMONS PLUMBING Category 410 - Residential-Interior Plan Water Softner Wait.St. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap 1 Clothes Wshr Exam Sink Catch Basin Ex! Grease Trap - - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind REPLACE LAUNDRY SINK WITH AIR ADMINTANCE VALVE "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1501580000 Use/Nature of Work Valuation Issued By $600.00 Plan Approval $0.00 $20.00 0 Pennil Voided I Permit Fees Date 05/03/2006 In the perlormance of this work, I agree to pertonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perlonn the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH Wi 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.