Loading...
HomeMy WebLinkAbout0119305-Plumbing (water heater) ~ OSHKOSH ON THE WATER Job Address 1410BERGERST CITY OF OSHKOSH No PLUMBING PERMIT. APPLICATION AND RECORD Owner LEE J KELLER Create Date Contractor SAMMONS PLUMBING Category 411 - Residential-Water Heaters Plan Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker - Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ex! Grease Trap - Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater 1 Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs RoolDrain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature 01 Work REPLACE GAS WATER HEATER "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1306860000 $20.00 D Permit Voided I Valuation $600.00 Plan Approval $0.00 Permit Fees Issued By Date 05/03/2006 In the performance 01 this work, I agree to perform all work pursuant to rules goveming the described construction. While the City 01 Oshkosh has no authority to enlorce easement restrictions 01 which it is not a party, il you perfonm the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals belore starting such activity. Signature Date Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.