Loading...
HomeMy WebLinkAbout2006-Plumbing (sump pump) e OSHKOSH ON THE WATER Job Address 1432 W 3RD AVE CITY OF OSHKOSH No Contractor SAMMONS PLUMBING PLUMBING PERMIT - APPLICATION AND RECORD Owner JEFFREY/PATRICI KANNENBERG . Category 410 - Residential-Interior Create Date Shower Floor Drain Lndry Tray Disposal Dishwasher Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater ~ Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Plan . Water Softner Local Waste Clothes Wshr Wail.SI. Shamp Sink ~ Coffee Maker Ice Chest FlrlWst Sink Int Grease Trap Exam Sink Catch Basin ~ Ext Grease Trap ~ Sculry Sink Wash Ftn RPZ Valve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp Bidet Beer Tap 1 Lab Sink Sterilizer Dip Well Drink Ftn Sanitary Sewer Material Type # Conn. Type Storm Sewer Water Service Parcelld # 0611820000 $300.00 Plan Approval Issued By r~~ "" ~W -~"" = Size $0.00 $20.00 0 Permit Voided I Permit Fees Date 05/03/2006 In the performance of this work. I agree to perform all work pursuant to rules goveming the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522W.MURDOCKAVE Agent/OWner OSHKOSH Telephone Number 231-9880 WI 54901 - 2298 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.