HomeMy WebLinkAbout2006-Plumbing (sump pump)
e
OSHKOSH
ON THE WATER
Job Address 1432 W 3RD AVE
CITY OF OSHKOSH
No
Contractor SAMMONS PLUMBING
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JEFFREY/PATRICI KANNENBERG
.
Category 410 - Residential-Interior
Create Date
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater ~
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Valuation
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Plan
. Water Softner
Local Waste
Clothes Wshr
Wail.SI. Shamp Sink ~ Coffee Maker
Ice Chest FlrlWst Sink Int Grease Trap
Exam Sink Catch Basin ~ Ext Grease Trap
~
Sculry Sink Wash Ftn RPZ Valve
Hand Sink Urinal Eye Wash Statn
Plaster Sink Standp Rec Wtr Sewer Mtrs
Surgeons Sink Ice Maker Deduct Meters
F Prep Sink Gar Drain Wtr Usage Mtrs
Serv Sink Soda Disp
Bidet
Beer Tap
1 Lab Sink
Sterilizer
Dip Well
Drink Ftn
Sanitary Sewer
Material
Type
#
Conn. Type
Storm Sewer
Water Service
Parcelld #
0611820000
$300.00
Plan Approval
Issued By
r~~ "" ~W -~"" =
Size
$0.00
$20.00 0 Permit Voided I
Permit Fees
Date 05/03/2006
In the performance of this work. I agree to perform all work pursuant to rules goveming the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W.MURDOCKAVE
Agent/OWner
OSHKOSH
Telephone Number 231-9880
WI 54901 - 2298
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.