Loading...
HomeMy WebLinkAbout0119301-Plumbing (water heater) ~ OSHKOSH ON THE WATER Job Address 538 W 15TH AVE CITY OF OSHKOSH No PLUMBING PERMIT - APPLICATION AND RECORD OWner ELDOR R SCHOENROCK Create Date Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater 1 Site Drain Roof Drain Misc. Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 411-Residential-WaterHeaters Plan Water Softner Wail.SI. Shamp Sink - Coffee Maker Local Waste Ice Chest FlrfWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Use/Nature 'REPLACE GAS WATER HEATER "DEBIT ACCT of Work Sanitary Sewer Conn. Type Storm Sewer Water Service Size Material Type # Parcelld # 1301040000 Valuation Plan Approval $600.00 Issued By $0.00 $20.00 0 Permit Voided I Permit Fees Date 05/03/2006 In the performance 0/ this work, I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W. MURDOCK AVE WI 54901 - 2298 Agent/Owner OSHKOSH Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.