Loading...
HomeMy WebLinkAbout0119262-Building (roof) ~ OSHKOSH ON THE WATER Job Address 819ÓREGONST CITY OF OSHKOSH No 119262 BUILDING PERMIT - APPLICATION AND RECORD Owner GJK PROPERTIES LLC Create Date 05/0212006 Designer Contractor LAKEWOOD ROOFING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Pennit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature of Work ~OMMERCIAL / ADDING FULLY ADHERED RUBBER ROOF OVER EXISTING BUILT UP ROOF, NO STRUCTURAL CHANGES HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $10,500.00 Plan Approval $0.00 Pennit Fee Paid $79.00 Park Dedication - $0.00 Issued By: /l)Is.::J Date 05/02/2006 Final/O.P. 00/00/0000 0 PennitVoided I Parcelld # 0900600000 In the perfonnance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrlçtions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address P.O. BOX 15 AgenUOWner WINNEBAGO WI 54985 - 0015 Telephone Number 235-1955 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.