Loading...
HomeMy WebLinkAbout0119247-Plumbing (exam sinks) e OSHKOSH ON THE WATER Job Address 500 S OAKWOOD RD CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 119247 Owner MERCY MEDICAL CENTER OSH INC Create Date 05/02/2006 Contractor BASSETT MECHANICAL Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Shower Floor Drain LndryTray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 440 - Industrial-Interior Plan WaterSoftner Wail.SI. Shamp Sink Coffee Maker - Local Waste Ice Chest FlrlWstSink Int Grease Trap Clothes Wshr Exam Sink 2 Catch Basin Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Roof Drain Misc. Fixtures Use/Nature ;Install new exam sinks in suite 104 "check #202035 of Work Valuation Issued By Size Material Type # Conn. Type Sanitary Sewer Address PO BOX 7000 Storm Sewer Water Service Parcelld # 0613660000 $1,900.00 Plan Approval $0.00 $21.00 0 Permit Voided I Permit Fees Date 05/02/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform tile work described in this permit application within an easement, tile City strongiy urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner KAUKAUNA WI 54130 - 7000 Telephone Number 800-236-2502~~920- To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.