Loading...
HomeMy WebLinkAbout2006-Building ~ OSHKOSH ON THE WATER Job Address 606 E MURDOCK AVE CITY OF OSHKOSH No 119261 BUILDING PERMIT - APPLICATION AND RECORD Owner MUZA METAL PRODUCTS CORP Create Date 05/02/2006 Designer T- Karrels Contractor OWNER Category 210'-Additlon Industrial Plan S5-34-0406 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: 2B Size Unfinished/Basement - Sq. Ft. _Sq. Ft. Rooms Height Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage - Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures ~ Use/Nature IND/ Genestruction of 18' x 112' addition as per State Transaction ID # 1266006 of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $40,000.00 Plan Approval $0.00 Permit Fee Paid $184.00 Park Dedication $0.00 Issued By: Date 05/0212006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1519310000 In the performance of this work I a"¡;;;~orm all work pursuant to rules governing the described construction. While the City of Oshkosh has n.l'a~t;'ority to e force easement restrictions of which it is not a party, if you perform the WOrk. . i described in this permi ap i~n ithin an eas ment, the City strongly urges the permit applicant to contact the easeme~t holder(s) and to secu a y ces ary approvals efore starting such aclivity. < ;}. ro G Signature Date . Agent/Owner Address PO BOX 707 OSHKOSH WI 54903 - 0707 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.