HomeMy WebLinkAbout2006-Building
~
OSHKOSH
ON THE WATER
Job Address 606 E MURDOCK AVE
CITY OF OSHKOSH
No
119261
BUILDING PERMIT - APPLICATION AND RECORD
Owner MUZA METAL PRODUCTS CORP
Create Date
05/02/2006
Designer
T- Karrels
Contractor
OWNER
Category
210'-Additlon Industrial
Plan S5-34-0406
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const: 2B
Size
Unfinished/Basement
- Sq. Ft.
_Sq. Ft.
Rooms
Height
Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
- Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
~
Use/Nature IND/ Genestruction of 18' x 112' addition as per State Transaction ID # 1266006
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$40,000.00 Plan Approval
$0.00 Permit Fee Paid
$184.00 Park Dedication
$0.00
Issued By:
Date 05/0212006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1519310000
In the performance of this work I a"¡;;;~orm all work pursuant to rules governing the described construction.
While the City of Oshkosh has n.l'a~t;'ority to e force easement restrictions of which it is not a party, if you perform the WOrk. . i
described in this permi ap i~n ithin an eas ment, the City strongly urges the permit applicant to contact the easeme~t
holder(s) and to secu a y ces ary approvals efore starting such aclivity. < ;}. ro G
Signature Date .
Agent/Owner
Address PO BOX 707
OSHKOSH
WI 54903 - 0707 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.