Loading...
HomeMy WebLinkAbout0119255-Plumbing (standpipe) e OSHKOSH ON THE WATER Job Address 1610 W 6TH AVE CITY OF OSHKOSH No 119255 Contractor D.R. HANSEN PLBG. PLUMBING PERMIT - APPLICATION AND RECORD Owner CATHERINE M RADDATZ Create Date 05/0212006 Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater - Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Valuation Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 410 - Residential-Interior $500.00 Plan Approval Water Softner Local Waste Clothes Wshr Bidet Coffee Maker Int Grease Trap Ex! Grease Trap - RPZ Valve Eye Wash Statn 1 Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Issued By Wail.SI. Ice Chest Exam Sink Shamp Sink - FlrlWst Sink Catch Basin Wash Ftn Urinal Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Beer Tap Lab Sink Sterilizer Standp Rec Ice Maker Gar Drain Dip Well Drink Ftn Soda Disp install stand pipe for automatic clothes washer (Debit Account) , Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0611370000 $0.00 $20.00 D Permit Voided I Permit Fees Date 05/0212006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 55 KNAPP ST AgenUOwner OSHKOSH Telephone Number 233-1595 WI 54902 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received, Work may continue if the inspection is not performed within two business days from the time the project is ready.