HomeMy WebLinkAbout2006-Plumbing
~
OSHKOSH
ON THE WATER
Job Address 3001 S WASHBURN ST
CITY OF OSHKOSH
No
119186
PLUMBING PERMIT. APPLICATION AND RECORD
Owner FIRST HORIZON GROUP LIMITED PTNSHP
Create Date 04/28/2006
Plan
Contractor JIM'S PLUMBING & HEATING INC
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Shower
Floor Drain
2 Lndry Tray
2 Disposal
Dishwasher
Sump Pump
1 Classrm Sink
Breakrm Sink
Category 440 - Industrial-Interior
Water sollner Wait. 51. Shamp Sink Coffee Maker
-
2 Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
-
Bidet sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash statn
Lab Sink Plaster Sink standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn 1 serv Sink 1 Soda Disp
Roof Drain
Misc.
Fixtures
Use/Nature Plumbing for new Gap store. Electric water heater, no EIV. "Debit acct ..
ofWork
Ejector/Grind
Size
]
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Material
Type
#
Conn. Type
I!
Parcelld #
1329420000
$14,000.00
Plan Approval
$0.00
Penmit Fees
$63.00 0 Permit Voided I
Date 04/28/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
WI 54942 - 0000
Telephone Number 920-757-5258
Address W6166 GREENVILLE DR
Agent/Owner
GREENVILLE
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.