Loading...
HomeMy WebLinkAbout0119208-Building (windows & doors) 0 OSHKOSH ON THE WATER Job Address 2012 CRANE ST CITY OF OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD No 119208 OWner STEVEN T WALL Create Date 04/28/2006 Contractor KLEIN'S HOME IMPROVEMENT Designer Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement - Sq. Ft. Rooms Height Finished/Living - Sq. Ft. Bedrooms Stories Garage - Sq. Ft. Baths Ft. D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units -------.!1 # Structures -------.!1 Use/Nature SFRI Constructing a new opening for a door off the porch for a future deck (under a seperate permit) to be completed this summer of Work (2006), replacing 9 windows, replacing service door and new entry door. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,849.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: CVJ Date 04/28/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1215570000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work described In this penmlt application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec¡J[e any approvals before starting such activity. (I Signature I Date )( 4-J-7 -0,," Address 972 E SUNNYVIEW RD LOT 9 Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number (920) 231-5301 HOM To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.