Loading...
HomeMy WebLinkAbout0119179 P e OSHKOSH ON THE WATER Job Address 1619 OSHKOSH AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD 119179 No Owner ELiZ B DAVIS CHILDRENS HOME Create Date 04/27/2006 Plan Contractor RADTKE CONTRACTORS INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Cate90ry 401 - Residential-Exterior (laterals) Shower WaterSoftner Wait. 51. Shamp Sink Coffee Maker ~ Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap ~ Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures UselNature Disconnect water and sewer and cap at lot line. ofWork Valuation Issued By Sanitary Sewer Size 4" # Conn. Type 1 Aband Material Vitrified Clay Type Lateral Storm Sewer Water Service 3/4" Lateral 1 Aband Parcelld # 1608600000 $0.00 Permit Fees $20.00 D Permit Voided I Plan Approval Date 04/27/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 6408 CROSS RD Date Agent/Owner WINNECONNE WI 54986 - 9731 Telephone Number (920)582-4114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.