HomeMy WebLinkAbout0119179 P
e
OSHKOSH
ON THE WATER
Job Address 1619 OSHKOSH AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
119179
No
Owner ELiZ B DAVIS CHILDRENS HOME
Create Date 04/27/2006
Plan
Contractor RADTKE CONTRACTORS INC
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Cate90ry 401 - Residential-Exterior (laterals)
Shower WaterSoftner Wait. 51. Shamp Sink Coffee Maker
~
Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
~
Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
UselNature Disconnect water and sewer and cap at lot line.
ofWork
Valuation
Issued By
Sanitary Sewer
Size
4"
# Conn. Type
1 Aband
Material
Vitrified Clay
Type
Lateral
Storm Sewer
Water Service
3/4"
Lateral
1 Aband
Parcelld #
1608600000
$0.00
Permit Fees
$20.00 D Permit Voided I
Plan Approval
Date 04/27/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 6408 CROSS RD
Date
Agent/Owner
WINNECONNE
WI 54986 - 9731
Telephone Number
(920)582-4114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.