HomeMy WebLinkAbout00119170 P
e
OSHKOSH
ON THE WATER
Job Address 2025 N MAIN ST
CITY OF OSHKOSH
No
119170
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WilLIAM AISHARO LAPOINTE SR
Create Date 04/27/2006
Contractor J RASMUSSEN PLUMBING INC
Bathtub
Whirlpool
lavatory
Toilet
Res. Sink
BarSink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Shower
Floor Drain
lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
1 hose bibb
Category 410 - Residential-Interior
Plan
WaterSoftner Wait. St. Shamp Sink - Coffee Maker
local Waste Ice Chest FlrlWst Sink Int Grease Trap
1 Clothes Wshr Exam Sink Catch Basin - Ext Grease Trap
-
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
1 lab Sink Plaster Sink Standp Rec 1 Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Replace laudry tray, install sump pump, replace outside silcock and InsJaIl new aow sJandpipe per city rehab project. "debit accl
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1514930000
Use/Nature
ofWork
Valuation
Issued By
$2,500.00
Plan Approval
$0.00
$28.00 0 Permit Voided I
Permit Fees
Date 04/27/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to conJact the
easement holder(s) and to secure any necessary approvals before sJarting such activity.
Signature
Date
Telephone Number 920-233-6747
Address 1914 GREENBRIAR TRl
Agent/Owner
OSHKOSH
WI 54904 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.